Error message

Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in menu_set_active_trail() (line 2405 of /home/newca162/public_html/includes/menu.inc).

Newcastle Observatory 2

Subscribe to Syndicate

Roll-off Roof Observatory

2020-06-04

I marked out the location of the four concrete piers (marked with orange paint).

2020-06-05

Today the posthole diggers arrived to bore the earth to receive four concrete piers; two for larger telescopes and two for smaller instruments.

We used a laser transit tool to level the top of each concrete form to +/- 1/8".

The four concrete forms are in place and secured with bracing.

The concrete is poured and the four jigs that each define the 3 bolts in predefined bolt circle have been inserted into the top of the concrete piers.